Microsoft KB Archive/58701: Difference between revisions

From BetaArchive Wiki
(importing KB archive)
 
m (Text replacement - "<" to "<")
Line 13: Line 13:
(DATE(YY,MM,DD)
(DATE(YY,MM,DD)


<blockquote>DATE(85,12,31) &lt;DATE(90,1,15) =DATE(81,10,25)
<blockquote>DATE(85,12,31) <DATE(90,1,15) =DATE(81,10,25)
</blockquote>
</blockquote>
Copyright Microsoft Corporation 1990.
Copyright Microsoft Corporation 1990.

Revision as of 09:34, 21 July 2020

Multiplan: Using Comparison Operators to Query Dates PSS ID Number: Q58701 Article last modified on 03-28-1990 PSS database name: D_MPlan

4.00 4.01 4.20

MS-DOS

Summary:

To use the comparison operators (greater than, less than, or equal to) to find a range of dates in a Multiplan Versions 4.x database, the dates must be entered into their cells as text using the DATE function along with the desired comparison operator.

The following are examples:

(DATE(YY,MM,DD)

DATE(85,12,31) <DATE(90,1,15) =DATE(81,10,25)

Copyright Microsoft Corporation 1990.