Article ID: 98026
Article Last Modified on 1/18/2007
APPLIES TO
- Microsoft Project 98 Standard Edition
- Microsoft Project 4.1 Standard Edition
- Microsoft Project 4.1a
- Microsoft Project 1.0 Standard Edition
- Microsoft Project 3.0 Standard Edition
- Microsoft Project 3.0a
- Microsoft Project 4.0 Standard Edition
This article was previously published under Q98026
SUMMARY
The following is a version history of Microsoft Project for Windows, beginning with the most recent version of Microsoft Project.
For a list of the changes in limits between versions, query on the following words in the Microsoft Knowledge Base:
feature and capacities
MORE INFORMATION
Version Date ------------------------------- Microsoft Project 98 10/30/97 System Requirements: - 12 MB memory under Windows 95 - 16 MB memory under Windows NT - Microsoft Windows 95, Microsoft Windows NT version 3.51 or later - 486 or higher processor - VGA or higher resolution video adapter - 20-40 MB of available hard-disk space Changes: -Project scheduling and tracking Custom time period tracking Task Usage and Resource Usage views Task splitting Effort-driven scheduling Enhanced earned value analysis Multiple critical paths Status date Multiple baselines New fields Changed fields Progress lines Honoring constraint dates Task types -Resource and cost management Improved resource leveling Resource work contours Variable pay rates Resource start and finish dates User-entered actual costs -Multiple project management Outline consolidated projects Increased consolidation limits Drilling down within multiple projects Cross-project linking Resource pooling -Analysis tools and methods Microsoft Excel PivotTables Microsoft Excel charts AutoFilters PERT analysis PERT analysis views Rollup views -Presentation features Web publishing Sharing information across Office programs Pictures in headers, footers, legends, and notes Improved printing -Workgroup and intranet support Workgroup features Out-of-the-box web solution Microsoft Outlook reminders -Desktop features Microsoft Office compatibility Easy data entry View Bar Indicators Microsoft Office web extensions Work with other task management tools Microsoft Outlook Journal support IntelliMouse -Database compatibility features New database format SQL/Oracle support Import/export maps Custom fields -Development tools Customizable user interface elements Enhanced development support Events Visual Basic Editor -User assistance Office Assistant and rich help Quick Preview Getting Started tutorial Microsoft Project 101: Fundamentals Visual Map Online Microsoft Project 98 User's Guide Technical resources Version Date ------------- 4.1 7/20/95 System Requirements: - 6 MB memory under Windows 95 12 MB memory under Windows NT - Microsoft Windows 95 Microsoft Windows NT version 3.51 or later - 386DX or higher processor - VGA or higher resolution video adapter Changes: - Runs only on 32-bit Operating Systems mentioned above - Answer Wizard - AutoCorrect - Long File Name support - Save to Database supports ODBC - Ability to customize Workgroup messages to include the fields you want - Posting ability to Microsoft Exchange Folders - New File Open dialog used by Office 95 - Improved speed - Opening non native MPP files is faster Version Date ------------- 4.0 4/15/94 System Requirements - 4 MB memory Required 8 MB memory Recommended - Windows version 3.1 or later Windows for Workgroups version 3.1 or later Windows NT version 3.1 or later - MS-DOS version 3.3 or later - VGA or higher resolution - 1.2 MB 5.25-inch or 1.44 MB 3.5-inch high-density drive Changes: - Relationship lines on Gantt Chart - Calendar View - Visual Basic for Applications macro language - Workgroup features utilizing electronic mail - Crosstab reports - Multiple project consolidation with up to 80 files - Common Microsoft Office menu structure - Drawing objects and OLE object inserted directly on Gantt Chart view - Easily create Recurring tasks - Individual cell and bar formatting - Ability to save information to an Access 2.0 database - Multiple Toolbars - Customizable Menu bar Version Date ------------- 3.0a 1/1/93 System Requirements: - 2 MB memory - Hard disk - MS-DOS version 3.0 or higher - Microsoft Windows 3.0 or later - 1.2 MB 5.25-inch or 1.44 MB 3.5-inch high-density drive Changes: Maintenance Release - Gantt chart Rollup causing unrecoverable application error (UAE) or general protection (GP) Fault - Resource Sharing causing UAE or GP Fault when saving files - Week numbering starts with wrong week - Paste Linking to % Complete from outside Microsoft Project failed - International settings incorrect after Setup Version Date ------------- 3.0 2/28/92 System Requirements: - 1. 2 MB of memory - Hard disk - MS-DOS version 3.0 or later - Microsoft Windows 3.0 or later - 1.2 MB 5.25-inch or 1.44 MB 3.5-inch high-density drive Changes: New version - Macro Language (Command equivalents) - Customizable toolbar to run Macros - Print preview - Improved leveling algorithm - Dynamic data exchange (DDE) capability - Supports OLE 1.0 Version Date ------------- 1.0 12/4/90 - 1 MB memory - Hard disk - MS-DOS version 3.0 or higher - Microsoft Windows 2.0 or later - 1.2 MB 5.25-inch or 720 K 3.5-inch drive Changes: - Requires Windows 2.0 or later to install and run (Run-Time Windows removed) Version Date ------------- 1.0 4/30/90 - 1 MB memory - Hard disk - MS-DOS version 3.0 or higher - Microsoft Windows 2.0 or later - 1.2 MB 5.25-inch or 720K 3.5-inch drive Changes: (None, first release of Microsoft Project.) - Comes with a Run-Time version of Microsoft Windows 2.1 (Windows 286)
Additional query words: 3.00a PRJ PRJ98
Keywords: kbfaq kbinfo KB98026