Maximum Start and Finish Dates in Project for Windows

PSS ID Number: Q44639 Article last modified on 03-15-1995

1.00 3.00 3.00a 4.00 | 1.10 3.00 4.00

WINDOWS | MACINTOSH

The information in this article applies to:
- Microsoft Project for Windows, versions 1.0, 3.0, 3.0a, 4.0s - Microsoft Project for the Macintosh, versions 1.1, 3.0, 4.0

The earliest possible start date of a project in Microsoft Project for Windows and Macintosh is January 1, 1984. The latest possible finish date is December 31, 2049.

KBCategory: kbother KBSubcategory:

Additional reference words: 1.0 1.00 1.1 1.10 3.0 3.00 3.00a 4.00