Article ID: 189878
Article Last Modified on 1/23/2007
APPLIES TO
- Microsoft Project 98 Standard Edition
This article was previously published under Q189878
SYMPTOMS
In Microsoft Project 98, resource Peak Units may display incorrectly in a resource view.
For example, time-phased resource Peak Units for a period may be blank even though the resource has assignments for that period.
CAUSE
This behavior occurs when multiple assignments for a single resource for the same time period exceed the Microsoft Project limit of 10,000 units (1,000,000 per cent) for a single resource assignment.
RESOLUTION
To correct this problem, install Microsoft Project 98 for Windows Service Release 1 (SR-1). Resource units will not be displayed incorrectly when multiple assignments for a single resource for the same time period exceed the Microsoft Project limit of 10,000 units (1,000,000 per cent) for a single resource assignment.
STATUS
This problem was corrected in Microsoft Project 98 for Windows, ServiceRelease 1 (SR-1).
For additional information about obtaining and installing SR-1, please see the following article in the Microsoft Knowledge Base:
185102 PRJ98: How to Obtain and Install MS Project 98 SR-1
MORE INFORMATION
If the sum of all assignments exceeds the 10,000 limit for any period, the time-phased resource Peak Units field for that period in the Resource Usage view will be blank, and the resource Peak field on a resource table will display as 1.
Keywords: kbbug kbfix KB189878