Article ID: 149974
Article Last Modified on 10/28/2006
APPLIES TO
- Microsoft Exchange Server 5.0 Standard Edition
This article was previously published under Q149974
SYMPTOMS
When you run ISINTEG with the "-fix" option, ISINTEG prematurely aborts processing in test 22 of 24 when Jet_errReadVerifyFailure is returned within CHKCNT::ECForcedDelAttach.
The screen output will look similar to the following:
Starting test 22 of 24, 'reference count verification' Number of Ref Count processed = 730710, 85% percent complete. Ref check on Attachment returned JET_errReadVerifyFailure . . . . . SUMMARY . . . . . Total number of tests : 24 Total number of warnings : 74 Total number of errors : 0 Total number of fixes : 862 Total time : 15h:38m:57s
Additionally, ISINTEG will log something similar to the following:
CAUSE
During processing, ISINTEG inappropriately returns an error, which results in a process exit.
STATUS
Microsoft has confirmed this to be a problem in Microsoft Exchange Server version 5.0. This problem was corrected in the latest Microsoft Exchange 5.0 Server U.S. Service Pack. For information on obtaining the service pack, query on the following word in the Microsoft Knowledge Base (without the spaces):
S E R V P A C K
Keywords: kbbug kbusage KB149974