Tasks with Blank Names Are Sorted First
PSS ID Number: Q48273 Article last modified on 03-15-1995
1.00 3.00 3.00a 4.00 | 1.10 3.00 4.00
WINDOWS | MACINTOSH
The information in this article applies to: |
- Microsoft Project for Windows, versions 1.0, 3.0, 3.0a, 4.0 - Microsoft Project for the Macintosh, versions 1.1, 3.0, 4.0 |
Tasks or Resources with blanks (such as the Name field) will appear first if the field with the blank is chosen as a sort key. This is a standard method of sorting.
Steps to Reproduce
- Enter a task name for ID = 1.
- Enter 2d for ID = 2 (leave name blank).
- Enter a resource for ID = 3.
- Enter a task name for ID = 4.
- Select Format, Sort - Name - ascending - OK.
NOTE: The blank names are sorted above the nonblank names.